隨著數字技術的發展,展廳中控滑軌電視在越來越多的企業展廳和紅色展廳中得到了廣泛的應用。那么展廳中控滑軌電視從策劃設計到施工的過程相關內容是怎樣的呢?
With the development of digital technology, the central control slide TV in the exhibition hall has been widely used in more and more enterprise exhibition halls and red exhibition halls. What is the relevant content of the process from planning and design to construction of the central control slide TV in the exhibition hall?
規劃設計階段
Planning and design stage
1、初步了解甲方需求:通過與甲方協商,明確甲方的規劃需求、預算及預期結果。
1. Preliminary understanding of Party A's needs: clarify Party A's planning needs, budget and expected results through consultation with Party A.
2、確定展館定位和主題:根據甲方需求,我廠經驗,結合實地考察,明確展館總體定位,確定展館主題展廳確定。
2. Determine the orientation and theme of the exhibition hall: according to the needs of Party A, our experience, combined with field visits, clarify the overall orientation of the exhibition hall and determine the theme of the exhibition hall.
3、展示內容規劃:根據展示內容、展示空間、埋伏相應人員,規劃整個展廳的總體規劃和重要展品的確定(客戶制作)。
3. Exhibition content planning: according to the exhibition content, exhibition space, ambush corresponding personnel, plan the overall planning of the whole exhibition hall and the determination of important exhibits (made by customers).
4、方案整合:根據以上三點,整合一個完整的展廳規劃方案。
4. Scheme integration: according to the above three points, integrate a complete exhibition hall planning scheme.
5、檢查調整:根據綜合方案,再次與甲方協商,并根據甲方需求進行進一步調整,直達到客戶滿意的展示效果。
5. Inspection and adjustment: according to the comprehensive plan, negotiate with Party A again, and make further adjustment according to Party A's needs, until the customer is satisfied with the display effect.
施工
construction
展廳的建設是對設計施工團隊的見證和考驗。一個好的施工設計方案和施工團隊對展廳的終呈現效果起著決定性的作用。
The construction of the exhibition hall is a witness and test for the design and construction team. A good construction design scheme and construction team play a decisive role in the final presentation effect of the exhibition hall.
1、施工前準備:重新確認施工圖紙、展廳展示智能展示設備、展廳中控系統軟件、展廳施工團隊等。
1. Preparation before construction: reconfirm the construction drawings, exhibition hall display intelligent display equipment, exhibition hall central control system software, exhibition hall construction team, etc.
2、施工交底:對設計部分和設計施工難點進行交接,包括施工工藝、材料、機構等問題,并做好相應的安排和準備工作。
2. Construction disclosure: handover the key parts of the design and the difficulties of the design and construction, including key issues such as construction technology, materials, institutions, and make corresponding arrangements and preparations.
3、圖紙審核:在施工交底的同時,與工程人員一起審核圖紙,確保圖紙信息的正確傳遞。
3. Drawing review: at the same time of construction disclosure, review drawings with engineering personnel to ensure the correct transmission of drawing information.
4、
展廳中控滑軌電視設備安裝確認:滑軌屏、觸控一體機、拼接屏等各種智能顯示設備的施工效果和材料是否符合設計標準。
4. The installation confirmation of the TV equipment of the central control slide in the exhibition hall: whether the construction effect and materials of the slide screen, touch all-in-one machine, splicing screen and other intelligent display devices meet the design standards.
5、中控系統:中控系統調試OK,保證滿足前置軟件集成要求。
5. Central control system: the commissioning of the central control system is OK to ensure that the front-end software integration requirements are met.
6、消防:消防是審核的主體,也是隱患的保障,包括消防法規的宣傳、消火栓的設置等。
6. Fire safety: fire safety is the subject of audit and the guarantee to eliminate potential safety hazards, including the publicity of fire laws and regulations, the setting of fire hydrants, etc.
7、其他:檢查電器和照明的安裝設置是否符合消防規定,同時對電器和各種照明設備進行測試。
7. Others: check whether the installation and setting of electrical appliances and lighting meet the fire protection regulations, and test electrical appliances and various lighting devices at the same time.
8、施工拆除:施工完成后,清理施工環境,保持基本清潔。
8. Construction Demolition: after the construction is completed, clean the construction environment and keep it basically clean.
9、售后服務:工程竣工后,如液晶設備在使用過程中出現故障,我們將在接到售后通知后短時間處理。
9. After sales service: after the completion of the project, if the LCD equipment fails in the process of use, we will deal with it in a short time after receiving the after-sales notice.
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://www.zkvd.cn And consult our staff, will serve you wholeheartedly.